| 28/03/12 |
India |
Dahej-Vijaipur Pipeline Upgrade |
Natural gas pipeline looping and compressor upgrade project |
Gail (India) Limited |
IFC Performance Standards (Environmental Impact Assessment) |
| 12/03/12 |
Peru |
Fenix Power Project |
Development of a 512 MW gas fired combined cycle power plant |
AEI and Subsidiaries |
IFC Performance Standards (Environmental Impact Assessment) |
| 21/12/11 |
Australia |
Brookfield Rail |
Financing of Brookfield Rail's network expansion in the south-west of Western Australia. |
Brookfield Infrastructure Partners |
Host country standard (Environmental Impact Assessment) |
| 14/11/11 |
Peru |
Lagunas Norte Expansion Project |
Expansion of the Process Water, slurry, ARD and polishing ponds, south stacking leach pad (Phase 5), leach pad (Phase 4C), east waste rock dump expansion (Phase 2), and various access roads (ECO 12). |
Hatch Ltd. |
IFC Performance Standards Environmental Impact Assessment, Environmental Management Plan, (Environmental Audit) |
| 09/09/2011 |
Australia |
Wiggins Island Coal Export Terminal Pty Limited |
Development of a 27mtpa coal export terminal at Wiggins Island, Queensland, Australia |
Hatch Ltd. |
IFC Performance Standards, Host country standard (Environmental Impact Assessment, Environmental Management Plan, Feasibility Study Assessment) |
| 19/05/2011 |
Angola |
Matala Dam Rehabilitation Project |
Rehabilitation of hydro dam in Angola limited to civil works associated with improvements to earth-gravity dam and spill way. |
Empresa Nacional de Electricidade, E.P. |
World Bank Safeguard Policies(Environmental Management Documentation) |
| 14/07/2011 |
United States |
Pacific Coast Canola LLC |
Construction and operation of a canola crush facility located in Warden, Washington |
Legumex Walker Inc. |
Host Country Environmental Standards (Equator Principles) |
| 27/06/2011 |
United States |
Greenpac Mill |
Construction and operation of a linerboard mill in Niagara, NY |
Cascades Canada Inc. |
Host country standards(Independent Third Party Review) |
| 06/06/2011 |
Australia |
Gold Coast Rapid Transit |
Design, construction, and operation and maintenance of a light rail public transportation system in the Gold Coast, Australia |
GoldLinQ Pty Limited |
Host country standards (Environmental Impact Assessment, Environmental Management Plan, Permit, Social Impact Assessment) |
| 22/09/2010 |
Chile |
Oxide Project/Minera El Tesoro |
Mirador Oxide Project (the Project) involves the development of the new Mirador pit on the Antofagasta concession 6 km from the El Tesoro Mine and heep leach operations. The pit development will include waste rock dumps, construction of a new 5 km haul road, extension of a power line and support infrastructure (warehouse, parking, site office). Ore from the Project will be processed on the existing Minera El Tesoro (MET) heap leach pads for copper extractions and cathode will be produced in the existing MET electro-winning facility. |
Antofagasta PLC |
Safeguard policies published by WBG (Environmental Management System) |
| 17/06/2010 |
Mexico |
Nuevo Pemex Cogeneration Project |
Construction of cogeneration facility within an existing petrochemical complex. |
Abengoa S.A., General Electric Capital Corporation |
World Bank Group, including IFC Environmental Management Plan |
| 08/03/2010 |
Canada |
Neptune Bulk Terminals Expansion |
Expanding the capacity at an existing bulk handling facility located in North Vancouver which exports primarily potash and coal, as well as canola oil. |
Neptune Bulk Terminals (Canada) Ltd. |
Host country standard (environmental management documentation) |
| 27/01/2010 |
Russia |
Prirazlomnoye Associated Gas Processing Project |
Construction of a gas processing and LPG recovery plant |
Monolit LLC (Borrower is OJSC Gazprombank) |
World Bank Group, including IFC (Environmental Impact Assessment) |
| 18/12/2009 |
Nicaragua |
San Jacinto-Tizate Geothermal Expansion Project (Phase I Modular Condensing Turbine) |
Design, develop, construct, finance, own, operate and maintain an additional 24 MW (net) expansion under its 25-year concession agreement |
Polaris Geothermal Inc. |
World Bank Group, including IFC (Environmental Impact Assessment) |
| 22/12/2009 |
United States |
I-4/Lee Roy Selmon Expressway Connector Interchange. |
Build-Finance contract for the construction of the I-4 / Lee Roy Selmon Expressway Connector, a limited access interchange. |
PCL Construction Holdings Ltd. |
Host country standard (environmental management documentation) |
| 04/11/2009 |
Ghana |
Takoradi Thermal Power Plant Expansion |
Expansion of a thermal power plant |
Ghana Ministry of Mines and Energy |
Host country standard, World Bank Group, including IFC (Environmental Impact Assessment) |
| 30/09/2009 |
Panama |
Petroterminal de Panama Phase II |
Expansion of oil storage facilities |
Petroterminal de Panama |
IFC Performance Standards (Environmental Impact Assessment) |
| 24/07/2009 |
United Arab Emirates |
Taweelah-Fujairah Pipeline Project |
Construction and operation of a natural gas pipeline |
Mubadala Development Company PJSC, Total S.A., Occidental Petroleum Corporation |
World Bank Group, including IFC (Environmental Impact Assessment) |
| 02/07/2009 |
United States |
Astoria Energy II Power Project |
Phase II of an existing natural-gas-fired thermal power plant |
SNC-Lavalin Group Inc. |
Host country standards (permits, environmental management documentation) |
| 20/03/2009 |
Bahamas |
Nassau Airport Expansion Project |
Expansion and modernization of existing airport, which will occur within the existing airport boundary. |
The Airport Authority of The Bahamas |
World Bank Group, including IFC (Environmental Management Plan) |
| 26/09/2008 |
United States |
Southern Lights Pipeline Project |
Construction of a diluent pipeline |
Enbridge Inc. |
Host country standards (permits, environmental management documentation) |
| 25/08/2008 |
United States |
Noble NY’08 Projects |
Construction of three wind farms with an aggregate electric generating capacity of 330 MW. |
Noble Environmental Power, LLC |
Host country standards (permits, environmental management documentation) |
| 11/01/2008 |
Turks & Caicos Islands |
Turks and Caicos Islands Hospitals Project |
Construction and operation of two small-scale hospitals |
InterHealth Canada Ltd. |
World Bank Group, including IFC (permits, environmental management documentation) |